[{"data":1,"prerenderedAt":54,"buildId":55},["ShallowReactive",2],{"\u002Fprojects\u002Fupgrade-of-control-system-for-al-luhass-degassing-station":3,"i-tabler:arrow-up-right":49},{"id":4,"title":5,"body":6,"description":33,"endDate":34,"extension":35,"meta":36,"navigation":37,"path":38,"projectFor":34,"seo":39,"startDate":34,"stem":40,"summary":41,"thumbnail":42,"visiuals":43,"__hash__":48},"projects\u002Fprojects\u002F5.upgrade-of-control-system-for-al-luhass-degassing-station.md","Upgrade of Control system for Al-Luhass Degassing Station",{"type":7,"value":8,"toc":29},"minimark",[9,13],[10,11,12],"p",{},"The scope of this project involved the complete replacement of an outdated Distributed Control System (DCS) at the Al-Luhais degassing station in Basra. This required the full range of engineering, procurement, construction, and demolition (EPCD) services to be delivered to ensure the successful replacement of the system.",[14,15,16,20,23,26],"ul",{},[17,18,19],"li",{},"Engineering: Detailed engineering studies were conducted to determine the best approach for replacing the DCS system in addition to that ,3D model was conducted for the whole facility , and reverse engineering was carried out for all missing drawings and data.",[17,21,22],{},"Procurement: The procurement of materials required for the project was carried out.",[17,24,25],{},"Construction: The installation of the new ICSS, control valves, and field instruments was carried out in a systematic and efficient manner. This included the construction of any necessary infrastructure, such as control rooms and other facilities.",[17,27,28],{},"Demolition: The old DCS system, control valves, and field instruments were dismantled and safely disposed of as part of the project.",{"title":30,"searchDepth":31,"depth":31,"links":32},"",2,[],"Comprehensive replacement of outdated distributed control system at degassing station through full engineering, procurement, construction, and demolition services. Installed new integrated control and safety system, control valves, field instruments, and infrastructure for optimal operations.",null,"md",{},true,"\u002Fprojects\u002Fupgrade-of-control-system-for-al-luhass-degassing-station",{"title":5,"description":33},"projects\u002F5.upgrade-of-control-system-for-al-luhass-degassing-station","The project involved replacing an outdated DCS at a degassing station with a new ICSS. Tasks included engineering studies, strategic procurement, systematic construction, and environmentally responsible demolition. Collaboration ensured a state-of-the-art control system, enhancing station safety and efficiency.","https:\u002F\u002Fik.imagekit.io\u002F1p7sbsx42\u002Fprojects\u002FUpgrade%20of%20Existing%20Gas%20Processing%20Facilities\u002Fimg_5.webp?tr=w-800,h-1200?updatedAt=1714369591085",[42,44,45,46,47],"https:\u002F\u002Fik.imagekit.io\u002F1p7sbsx42\u002Fprojects\u002FUpgrade%20of%20Existing%20Gas%20Processing%20Facilities\u002Fimg_3.webp?tr=w-800,h-1200?updatedAt=1714369590325","https:\u002F\u002Fik.imagekit.io\u002F1p7sbsx42\u002Fprojects\u002FUpgrade%20of%20Existing%20Gas%20Processing%20Facilities\u002Fimg_2.webp?tr=w-800,h-1200?updatedAt=1714369589971","https:\u002F\u002Fik.imagekit.io\u002F1p7sbsx42\u002Fprojects\u002FUpgrade%20of%20Existing%20Gas%20Processing%20Facilities\u002Fimg_1.webp?tr=w-800,h-1200?updatedAt=1714369589630","https:\u002F\u002Fik.imagekit.io\u002F1p7sbsx42\u002Fprojects\u002FUpgrade%20of%20Existing%20Gas%20Processing%20Facilities\u002Fimg_4.webp?tr=w-800,h-1200?updatedAt=1714369585951","qJcEEqiiGKGxQAAt1-vsUD5cNOEuqo2rqdCONxmdFyY",{"left":50,"top":50,"width":51,"height":51,"rotate":50,"vFlip":52,"hFlip":52,"body":53},0,24,false,"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M17 7L7 17M8 7h9v9\"\u002F>",1795600203604,"378f9431-f6a7-4e9b-990f-2cac5ca58d85"]